![]() |
|||||||||||||||||||||||||
![]() |
Porches and Exterior RemodelingThank you for the time that you have taken to visit our Exteriors Showroom. We've provided a variety of Exterior Projects of varying price ranges and styles to give you a sampling of our craftsmanship and design acumen. Every project shown below is a NARI award winner; and we have many more to offer. Our objective is simple, meet our clients needs, stay within a agreed upon budget, and produce a finished product that matches seamlessly with the architecture of your home. **Click on pictures to enlarge
This was not a project of want, as much as it was for
need. The wife was in the ninth month of her pregnancy with their fifth child
and the home was already tight for their needs. In a few years they will have
to move to larger living quarters. The client was preparing the property for
its sale, and the street elevation had no The house was constructed in 1926. It was evident at the time reviewing the existing conditions, aspects of the original porch's construction still existed although they were significantly altered. This prompted a search of a Plat of Survey. To our surprise, a Plat of Survey with a photograph of the front elevation was discovered. We reviewed the picture taken from the survey with our architect. This allowed us to develop a feeling of what the original porch would have looked like in 1926. From that, a second meeting was held with the client. At the meeting we discussed our findings and indicated that several design features from the original porch design would have to altered to comply with current codes, i.e.: the height of side railings and the addition of side railings to the steps. The client agreed to abandon their original designs in favor of the restoration alternative that we proposed. We provided periodic supervision and direction to them while they put ~eat equity into the demo and disposal of the existing structure. In addition, we agreed that they would dig the footings, have them inspected, and to have our personnel present to mark the footing centers prior to pouring them. Surprisingly, this worked out better than we all had expected. We were able to proceed with the construction and stay within their budget by allowing them to perform some of the work themselves. Excluding the clients work on the demolition and several rain delays, the construction was completed within seven days. View More Projects |
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||